Control4 Takeovers & Rack Rebuilds
This is before and after we have taken over and completed our takeover and completed our rack tidy.
Gosforth before
We were called in to a so-called "custom" Control4 install from another dealer. The open rack was a tangle of unmanaged patch leads, with a loose power strip hanging off the frame and kit stacked wherever it would fit. There was no remote power management, no labelling and no airflow planning. It was hard to service and unreliable to live with.

Gosforth after
We stripped it back and rebuilt it properly in an enclosed, ventilated cabinet:
-
DrayTek router for a stable, secure network core
-
Araknis managed switches with clean, dressed patching
-
WattBox PDU so we can power-cycle any device remotely, often fixing problems without a site visit
-
Triad amplifiers and audio matrix for multi-room music distribution
The client now has a tidy, quiet, fully supported system that we can monitor and maintain remotely.

Newbottle after
We rebuilt the rack from the ground up with a DrayTek router, Araknis network switching, a Control4 controller and WattBox power management, so equipment can be monitored and restarted remotely. Every cable is now labelled at both ends and neatly dressed, making the system reliable, easy to service and good to look at.




_JPG.jpg)
